Heavy Vehicle Workshop

Project Details

Location : Enterprise Mine site, Ora Banda, WA
Specifications : (3x) 17m wide Super Rise x 20.25m long DomeShelter®; two side-by-side on triple stacked
Purpose : Heavy Vehicle Workshop

The Challenge

The project design and management company, Engenium, wanted to get a supplier that can provide a high clearance above triple-stacked containers as a Heavy Vehicle Workshop.

Our Approach

Engenium looked at various shed and shelter options for off-highway trucks and came back to DomeShelter Australia™ as their final choice, realizing that the brand was the most cost effective solution that could provide the necessary 7.0m height clearance. DomeShelter Australia engineered, manufactured, delivered to the site, and installed the set up to existing containers.